System Prep
-
Panels are removed and prepared for
painting.
-
All components are vacuumed and detailed.
-
Sanding and filler work if needed is
completed.
-
The system is given a fresh coat of
industrial grade paint if needed.
-
Moving parts are checked for wear and
lubricated or replaced if needed.
-
Everything is assembled and checked for fit
and finish.
-
Fresh batteries from our battery
distribution warehouse are installed.
-
Any options such as transfer switches, comm
cards, are installed.
-
System is moved into one of four custom
staging bays and cabled up.
-
Inspection and approval by Operations
Manager.
Engineering
-
Complete staging of equipment.
-
Perform pre-stage scans to determine
starting condition of unit.
-
Update database with any technical
considerations to be addressed.
-
Replace worn components as required such as
Fans, Capacitors,
Filters, etc.
-
Any options required are installed and
verified.
-
Run all final quality assurance testing
according to Original Equipment Manufacturer
specifications.
-
All forms and checklists are completed.
System is calibrated, Q/A images are done.
-
Inspection and approval by Depot Lead
Engineer.
Packing and
Shipping
-
Panels and
covers are attached, wrapped and packed.
-
All accessories
are identified and boxed.
-
Final
inspection or cleaning of system finish
before shrink wrapping.
-
Checklist is
completed and signed, database is checked
and updated.
-
System is
loaded, blanket wrapped, and secured on one
of our "Air-Ride" trucks.
-
Operations
Manager signs off on system.
|
|
|